The South Jersey Transportation Authority continues to provide the traveling public with safe and efficient transportation through the construction, maintenance, operation and support of expressway, airport, transit, parking, other transportation projects and services.
 | A third lane will be added to the Westbound Atlantic City Expressway from Exit 7 (Garden State Parkway) to Exit 31 (Route 73). The widening will be performed in three stages. [ more ] |
|  | The Interchange 17 Ramp Improvements project includes the construction of new ramps to complete the missing ramp movements at this interchange, widening the existing expressway bridge, and installation of new ramp toll plazas, ramp lighting, traffic signals, roadway drainage, infiltration basins and landscaping. [ more ] |
|  | The Widening of Bridge No. 37 project includes the widening of the existing four (4) lane bridge to a six (6) lane bridge. Four (4) lanes will be for through traffic and two (2) lanes will be exclusive left-turn lanes for traffic turning onto the Expressway ramps. [ more ] |
|  | The Bridge Repair project includes the general maintenence repairs and erosion control measures to various bridges along the Atlantic City Expressway and Atlantic City Expressway Connector. [ more ] |
|
|
|
|
|